URI Logo

Wayzata Flood

Total Project $207,951.14

The URI Difference

Project Budget

Original Offer: $51,682.01

Final Offer: $207,951.14

Added Value: $156,269.13 (75.15%)

Project Overview

  • URI's final agreed upon estimate with the insurance company was $207,951.14. The insurance companies first estimate was for $51,682.01. That is an additional $156,269.13 or 75% of value recovered by URI which was put into this project.
  • The insurance company was only partially gutting the bathroom, URI was able to get the insurance company to gut the entire bathroom to ensure no mold.
  • The homeowner was able to redesign their Master Bath into their own private spa.

Before & After Photos

Wayzata flood before photo
Wayzata flood after photo
Wayzata flood before photo
Wayzata flood after photo
Wayzata flood before photo